李榮貴 教授

  • 美國亞歷桑那州立大學 工業工程博士1986
  • 制約管理、策略決策分析、問題分析與解決
03-5731996 | Email: rkli [at] cc.nctu.edu.tw | Office: MB514

代表性著作

著作
Ching-Kuo Wei, Liang-Chih Chen, Rong-Kwei Li, Chih-Hung Tsai, Hsiao-Ling Huang, A study of optimal weights of Data Envelopment Analysis – Development of a context-dependent DEA-R model, has been accepted for publication in Exper Systems With Applications (2012),
Chia-Ling Huang, Hao-Ging Chang, Rong-Kwei Li, and Chih-Hung Tsai. Using Game and Statistical Analysis to Confirm Goldratt’s Logical Analysis of Bad On-Time Deliver in A Multi-Project Environment. South African Journal of Industrial Engineering, Vol. 22(2), pp. 133-150, 2011. ,
Ching-Kuo Wei, Liang-Chih Chen, Rong-Kwei Li, Chih-Hung Tsai, Exploration of efficiency underestimation of CCR model: Based on medical sectors with DEA-R model, Exper Systems With Applications, Vol 38, 3155–3160, 2011,
H. P. Chiu, C. H. Liu and R. K. Li, Essential needs and requirements of mobile phone for the deaf, Assistive Technology Journal.Volume 22, No1, pp. 172-185, 2010,
J.H. Lee, J.G. Chang, C.H. Tsai and R.K. Li, Research on enhancement of TOC simplified Drum-Buffer-Rope system using novel generic procedure, Exper Systems With Applications. Vol 37, 3747–3754, 2010,
C. H. Liu, H. P. Chiu and R. K. Li, Optimizing the Usability of Mobile Phones for Deaf Individuals, Assistive Technology Journal. Volume 22, No1, pp. 115-127, 2010,
J. H. Lee and R. K. Li “Why High DDP is difficulty to achieve” APICS Journal of production and inventory management,Vol 46, No.1, PP.30-45, 2009,
C. K. Lin, H. C. Chen, R. K. Li, C. P. Chen and C. H. Tsai, Research on increasing the production yield rate by Six Sigma method: A case of SMT process of main board, The Asian Journal On Quality, Vol. 10, No.1, pp.1-24. 2009,
K. W. Zheng, C. H. Tsai, R. K. Li, C. P. Chen, The development of the distribution/VMI game based on TOC, The Asian Journal On Quality, Vol. 10, No.1, pp.53-76, 2009,
T.F. Ho and R. K. Li “Bottleneck-based heuristic dispatching rule for optimizing mixed TDD/IDD performance in various factories” International Journal of Advance Manufacturing Technology (IJAMT) 2008, Vol. 36, No. 7-8 ,
Y.-C. Lin, C.-H. Tsai, R.-K. Li, C.-P. Chen and H.-C. Chen, (2008), "The Study of the Cycle Time Improvement by Work-In-Process Statistical Process Control Method for IC Foundry Manufacturing," The Asian Journal On Quality, Vol. 9, No. 3, pp.71-91. ,
T. C. Liu, R. K. Li, " A new Art-Counterpropagation neural network for solving a forecasting problem", Exper Systems With Applications, 28, 21-27. (2005),
Chen, K. L., Chen, K. S. and Li, R. K., 2005, “Suppliers Capability and Price Analysis Chart”, International Journal of Production Economics 98(3), 315-327,
Huang, M. L., Chen, K. S. and Li, R. K., “Graphical Analysis of Capability of a Process Producing a Product Family”, Quality & Quantity, October 2005, Vol. 39, No. 5, 643-657,
Chen, K. S., Chen, K. L. and Li, R. K., “Contract Manufacturer Selection by Using the Process Incapability Index Cpp,” International Journal of Advanced Manufacturing Technology, 2005, Vol. 26, 686-692,
Liu T. C., Li R. K., Chen M. C., “Development of an Artificial Neural Network to Predict Lead Frame Dimensions in an Etching Process”, International Journal of Advanced Manufacturing Technology, Published online in April 2005,
C. F. Ho and Rong-Kwei Li, 2004, “TDD/IDD Dispatching Rules developed,“International Journal of Production Research,V42(24), 5133-5147,
Hsu-Hao Yang, T. C. Liu and R. K. Li "Clustering Data to Improve Packaging for the Semiconductor Industry", 計量管理學刊, Vol 1, 13-23. (2004),
Chen, K. S., Li, R. K. and Liao, S. J., “Process capability analysis of a product family of larger-the-better type,” Journal of Information & Optimization Sciences, 2004, Vol. 25, No. 1, 93-104,
Sheng-Hung Chang, Ping-Feng Pai, Kuo-Jung Yuan, Bo-Chang Wang, Rong-Kwei Li., “Heuristic PAC model for hybrid MTO and MTS production environment,” International Journal of Production Economics, 85, 347-358, 2003.,
Kuo-Jung Yuan, Sheng-Hung Chang and Rong-Kwei Li, 2003,“Enhancement of TOC Replenishment Using a Novel Generic Buffer Management Procedure ,” International Journal of Production Research, pp725-740.,
Chih-Hung Tsai, Yun-Min Feng & Rong-Kwei Li, 2003, “A Hybrid Dispatching Rules in Wafer Fabrication Factories, International Journal of the Computer, the Internet and Management,Vol 11 no1. pp.64-72.,
C.-H. Lo, Y.-H. Lin, C.-H. Tsai and R.-K. Li, 2003, "A Case Study of ERP Implementation Project for PCB Manufacturer," Asian Journal On Quality, Vol. 4, No. 1, pp.160-174.,
Huang, M. L., Chen, K. S. and Li, R. K., (2003) “Process Capability Evaluation for a PVC Pipe Product Family”, The Asian Journal on Quality, 3(1), 61-70. ,
Chen, K. S., Chen, S. C. and Li, R. K., (2002) “Process Quality Analysis of Products,” International Journal of Advance Manufacturing Technology , 19, 623-628,
Chen, K. S., Chen, K. L. and Li, R. K. “Measuring Services Quality based on Number of Customer Complains”, Journal of Interdisciplinary Mathematics, 2002, Vol. 7, No. 1, 113-124.,
Liao, S. J., Chen, K. S., and Li, R. K., (2002) “Capability Evaluation for Processes of the Larger-the-better Type for non-normal populations,” Advances and Applications in Statistics, 2(2), 189-198.,
Chen, K. S., Li, R. K., and Liao, S. J. (2002) “Capability Evaluation of A Product Family for Processes of The Larger-the-better Type,” International Journal of Advance Manufacturing Technology, 20, 824-832,
K. S. Chen, M. L. Huang and R. K. Li. “Process Capability Analysis for an Entire Product”. International Journal of Production Research (Volume 39, Number 17. 2001. pp. 4077 – 4087),
K. S. Chen, S. C. Chen and R. K. Li., 2001, “ Quality Analysis of Capacitors”,Quality Review,vol 8, no1.,
L. C. Lin, C. H. Tsai, K. Y. Chen and R. K. Li. “Designing a Flexible Production Flow Using IDEF1x -- an IC Packaging WIP System”. International Journal of the Computer, the Internet and Management (Volume 9, Number 2. 2001),
L. C. Lin, J. W. Chang, L. H. Chang, C. H. Tsai and R. K. Li. “Enhancement of Production Efficiency in the IC Packaging Industry via a Computerized WIP and Scheduling System”. International Journal of the Computer, the Internet and Management (Volume 9, Number 1 . 2001),
S. H. Chang,etl. And . K. Li,2001,”Mix Production Control for IC Fab”, CIIE,Vol 18, no4, pp59-72。,
C. L. Huang, etl, Rong-Kwei Li,2001, “Bottleneck shifting study,”CIIE,Vol 18, no4, pp73-81。,
K. S. Wang, etl. Rong-Kwei Li, 2000,Integrated Product design model design,Web Journal of Chinese Management Review, Volume 3, Number1。,
W. Y. Lou,etl. Rong-Kwei Li,2000, "Linear incremental demand replenishment policy—using matrix resolution approach",CIIE,Volume 17, Number 1, pp15-23。,
T. H. Tsai and R. K. Li. “A Novel Due-Date Oriented Scheduling Heuristic for Cellular Manufacturing System”. The International Journal of Industrial – Theory, Application and Practice (Volume 7, Number1. 2000. pp 76 – 88),
T. Y. Tseng and R. K. Li,2000, ”MPS study under demand uncertainty environment,”CIIE,vol 17, no 6, pp.615-630。,
K. Z. Yang, etl. Rong-Kwei Li,1999,Constraint-based rework and scrap model for IC Fab,Web Journal of Chinese Management Review, Volume 2, Number 6。 ,
T. H. Tsai and R. K. Li.,1999, "A heusristic scheduling system for job-shop environment",Web Journal of Chinese Management Review,Volume 2, Number 4, p.11-21。,
W. L. Lou,T. H. Tsai and R. K. Li,1999, "Linear incremental demand replenishment policy ",Web Journal of Chinese Management Review, Volume 2, Number 3, p.97-105。,
T. H. Tsai, C. Y. Tseng and R. K. Li,1999, "Order releasing and botttleneck dispatching management system design",Web Journal of Chinese Management Review, Volume 2, Number 2, p.51-66。,
L. C. Lin, etl, R. K. Li,1999,”Flexible Flow design model—IC assembly ,”Web Journal of Chinese Management Review ,Volume2, Number5。,
S. H. Chang, etl and R. K. Li,1999, ”Constraint based dispatching model for IC Fab,”CIIE,vol 16, no 2, pp. 209-220。,
Tseng, Hwia-En and Rong-Kwei Li.,1999, “Connector Based design Model ,”CIIE,vol 16, no 3, pp. 353-361。.,
T. Y. Tseng, R. K. Li. “Mixing the Macro and Micro Flow Time Estimation Model – A Wafer Fab Example”. International Journal of Production Research (Volume 37, Number 11. 1999. pp 2447 – 2461),
C. L. Huang and R. K. Li. “The Construction of a Production Performance Prediction System for Semiconductor Manufacturing with Artificial Networks”. International Journal of Production Research (Volume 37, Number 6. 1999. pp. 1387 – 1402),
Tseng, Hwia-En and Rong-Kwei Li. “A Novel Means of Generating Assembly Sequences Using the Connector Concept”. International Journal of Intelligent Manufacturing (Volume 10, Number 5. 1999. pp. 423 – 436),
Tseng, Hwia-En and Rong-Kwei Li. 1998, “Using AHPfor Design Decision”Design Journal,vol 3. No 1, pp. 43-54。,
C. H. Tsai, W. Y. Shyu, Y. M. Feng and R. K. Li. “A Novel Hybrid Dispatching Rules in Wafer Fabrication Factories”. Journal of the Ta-Hwa Institute of Technology (Volume 14. 1998. p.301 – 310),
C. L. Huang,etl and R. K. Li. “An Order Releasing Method to Avert Bottleneck Shifting in Semiconductor Wafer Manufacturing” CIIE,(Volume 15, Number 5. 1998. pp. 449 – 456),
Y. M. Du and R. K. Li. “A Constraint Time Buffer Determination Model”. International Journal of Production Research (Volume 36, Number 4. 1997. pp. 1091 – 1103),
S. G. Chen, M. Z. Wu and R. K. Li. “Design of a Rule-Based Continuous Process Controller using the Modified IDEF0 Methodology”. International Journal of Industrial Engineering (Volume 4, Number 3. 1997. pp167 – 178),
H. H. Wu and R. K. Li,1997, “Production Schedule and reschedule problem study,” CIIE,Vol 14, Number 2, pp.147-158。,
C. H. Tsai and R. K. Li,1997, “Capacity Constraints Due Day performance study,” CIIE, Vol 14, no 3, pp 305-318。,
S. H. Chang and R. K. Li,1997,“ECN Decision Model—Long lead time production environment,” CIIE,Vol 14, Number 2, pp. 195-207。,
T. H. Tsai and R. K. Li. “Integrated Due Date Assignment Rules”. International Journal of Production Research (Volume 35, Number 12. 1997. pp.3379 – 3392),
S. G. Chen, M. Z. Wu and Rong-Kwei Li. “Design of a Rule-Based Flexible Manufacturing System using the Modified IDEF0 Methodology”. International Journal of Production Research (Volume 35, Number 10. 1997),
Sheng-Hung Chang, Wen-Liang Lee and Rong-Kwei Li. “A Manufacturing Bill for Material Planning”. International Journal of Production Planning and Control (Volume 8, Number 5. 1997. pp. 437 – 450),
Horn-Huei Wu and Rong-Kwei Li. “A Methodology for Schedule Compression”. International Journal of Production Planning and Control (Volume 7, Number 4. 1996. pp.407 – 417),
Rong-Kwei Li, Chan-Yi Lin and Horng-Huei Wu. “A Feature Modification Framework for Feature-Based Design Systems”. International Journal of Production Research (Volume 33, Number 2. 1995. pp. 549 – 563),
Horng-Huei Wu and Rong-Kwei Li. “Capacity Constraint Resources Wandering and its Wandering Behaviors in a Production Plant”. CIIE (Volume 12, Number 1. 1995. pp. 63 – 69),
Horng-Huei Wu and Rong-Kwei Li. “A New Rescheduling Method for Computer-Based Scheduling Systems” International Journal of Production Research (Volume 33, Number 8. 1995. pp. 2097 – 2110),
M. C. Liu, C. T. Tsai, S. K. Liang and R. K. Li. “A Multi-Echelon Evaluation Framework for CIM System Design”. International Journal of Computer Integrated Manufacturing (Volume 7, Number 4. 1994. pp.201 – 214),
Rong-Kwei Li, Yu-Tang Shyu and Sdash Adiga. “A Heuristic Rescheduling Algorithm for Computer-Based Production Scheduling Systems”. International Journal of Production Research (Volume 31, Number 8. 1993. pp.1815 – 1826),
R. K. Li, Y. M. Du and T. Yang. “Applying the Concepts of Variation Geometry to Feature-Based Design”. International Journal of Production Research (Volume 31, Number 7. 1993. pp.1521 – 1540),
Rong-Kwei Li and Chun-Long Hwang. “A Framework for Automated DFA System Development”. Computers and Industrial Engineering (Volume 22, Number 4. 1992. pp.403 – 413),
Rong-Kwei Li andChun-Long, Hwang. “Assembly Code Generation from Feature-Based Geometric Models”. International Journal of Production Research (Volume 30, Number 3. 1992. pp.627 – 646),
Shi-Lih Chen, Zen Chen and Rong-Kwei Li. “Drawing Graph Representations for Rotational Parts”. Internal Journal of Computer Intergrated Manufacturin (Volume 4, Number 1. 1991. pp. 45 – 56),
R. K. Li and H. J. Hsu. “A Two-Stage Feature Based Design Concept”. International Journal of Production Research (Volume 29, Number 1. 1991. pp.133 – 154),
Rong-Kwei Li and Shen-Der Tzieng. “Machinable Volumes Extraction – Raw Materials to Finished Parts”. Internal Journal of Computer Intergrated Manufacturing (Volume 4, Number 4. 1991. pp.241 – 252),
Rong-Kwei Li and Ming-Hwang Yu. “A Framework for the Prismatic Part Data Recognition – Unit-Machining Loop Concept”. International Journal of Computer Integrated Manufacturing (Volume 3, Number 2. 1990. pp.96 – 111),
Der-Baau Perng, Zen Chen and Rong-Kwei Li. “Automatic 3D Machining Features Extraction from 3D CSG Solids”. Computer Aided Design (Volume 22, Number 5. 1990. pp.285 – 295),
Rong-Kwei Li and Tai-Zen Hwang. “An Extraction of a Part Feature Recognition System for Rotational Parts – No-Turning Features”. International Journal of Computer Integrated Manufacturing (Volume 2, Number 5. 1989. pp. 257 – 267),
R. K. Li and D. Bedworth. “A Framework for the Integration of CAD/CAPP”. Computer and Industrial Engineering (Volume 14, Number 3. 1988. pp. 395 – 413),
Rong-Kwei Li. “A Part Feature Recognition System for Rotational Parts”. International Journal of Production Research (Volume 26, Number 5. 1988. pp. 1451 – 1475),
R. K. Li and S. Adiga. “A Part-Feature Recognization System: A Vital Link in the Integration of CAD and CAM”. Recent Developments in Production Research, Edited by A. Mital, Elsevier Publishers (1987. pp. 581 – 588),

近期研究計畫

計畫名稱計畫時間補助/委託機構
應用模擬遊戲克服企業不採用拉式供應鏈管理模式的三個障礙
2012年08月 ~ 2013年07月
國科會
以實務善過程驗證TOC解決方案之有效性與可行性
2011年08月 ~ 2012年07月
國科會
應用TOC CCPM戰略與戰術圖快速改善多專案管理績效---個案研究
2010年08月 ~ 2011年07月
國科會
透過實驗證明為什麼供應鏈Flow改善是如此的困難
2009年08月 ~ 2010年07月
國科會